Got Big Water

YouTube
YouTube Channel

Facebook
Facebook Page

Twitter
Twitter Page

Rural Water Supply Operations Seminar
Rural Water Supply Operations Seminar

Water Supply Officer Seminar
Water Supply Officer Seminar

Relay Pumping With Large Diameter Hose
Relay Pumping With Large Diameter Hose

Dry Fire Hydrants Seminar
Dry Fire Hydrants Seminar

Dry Fire Hydrant Designs and Installations
Dry Fire Hydrant Designs and Installations

Suction Strainer Flow Test Project:Test Results

Web Counters
Website Visitors
Since
June 22, 2009
3,030,995
Visitors Today
Sep 08, 2024
223



Official PayPal Seal
Inspecting Underground Fire Protection Water Storage Tanks #02 - ISO Certified Sites
Email Print RSS Facebook Twitter RSS

By President Mark Davis
March 12, 2015

Part of receiving full credit for a "certified" static water supply in ISO's FDS is the inspection and flowtesting of those water supply sources. Many locales are moving to the use of large underground cisterns (tanks) as a means by which to provide strategically located, reliable water supply sites in rural areas. The 30,000-gallon tank is the minimum size recognized by ISO (250 gpm flow for 2-hrs). Part of a FD's water supply program must include the quarterly inspection and annual flowtesting of those tanks. The inspection is easy - complete a visual check for accessibility, damaged piping and fittings, signage, water tank level, etc...and of course, document that inspection.

For the flow test, you will need to establish a draft from the tank and flow water that can be measured (pitot gauge and chart). There is no time requirement regarding the length of the flowtest - but a reasonable practice is to flow for up to 3 minutes - that allows sufficient time for suction strainer issues to develop while minimizing the amount of effort needed to refill the tank at the end of the test. Many folks shoot for 1,000 gpm because that is the minimum fill rate for NFPA 1901 spec tankers. Also - many of the 30,000-gallon tanks use 6-inch suction pipe and fittings and those easily support a 1,000 gpm flow. Rember, once you are done flowtesting, be sure to refill the tank.

Website Designed and Hosted By: Content Proudly Maintained By: Contact Info:
Firehouse Solutions
www.FirehouseSolutions.com
GBW Associates, LLC
3178 Cardinal Drive
Westminster, MD 21157

Emergency Dial 911
Phone: 443-398-6619
E-mail: thebigcamel@gotbigwater.com
Copyright © 2024 Firehouse Solutions (A Service of Technology Reflections, Inc.)